2023年全國碩士研究生考試考研英語一試題真題(含答案詳解+作文范文)_第1頁
已閱讀1頁,還剩39頁未讀 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

1、 分類號: C93 C93 密級: UDC: 65 65 學(xué)校代碼:11065 碩 士 專 業(yè) 學(xué) 位 論 文 A 機場航煤管道項目安全管理研究 金鵬 金鵬 指 導(dǎo) 教 師于慶東教授 學(xué) 位 類 別工程碩士 專 業(yè) 領(lǐng) 域項目管理 答 辯 日 期2017 年 6 月 4 日 II Abstra

2、ct A International Airport is located in the northeast of Ji'nan, 28 kilometers away from the city center, covers an area of more than 1000 acres, is one of China's important trunk airports. Its fuel pipeline was

3、 built in October 1992, and in August 1994, there was no automatic control measures, and the pipeline was rated as 5km grade and poor grade. In the existing safety spacing 3 deposits and lack of buildings. The problems o

4、f higher handling, poor reliability, multiple oil loss, the existing freight boat coal transportation. With the development of A International Airport, the security problems of the existing transport modes will become mo

5、re and more prominent, so it is necessary to study the safety management of the airport aviation coal pipeline project. Based on the purpose of preventing and reducing the safety problem of the airport coal pipeline proj

6、ect, this paper systematically expounds the theory and method of safety management of the project. On the basis of the literature research, this paper makes a deep analysis of the current situation of the safety manageme

7、nt of A airport coal pipeline project. Through the pipeline, the area covered with air coal resources and consumer market analysis, according to preliminary determine the pipeline route, transportation capacity, transpor

8、tation, transportation volume and main engineering technology scheme, analyzing the existing problems of pipeline project in safety awareness and management system, safety distance, pile setting, network information mark

9、 safety education and training system, etc.. Finally put forward the solution scheme of the security from the aspects of improving safety awareness and improve the project safety system, specification design, setting up

10、multimedia monitoring system, strengthen safety training, strengthen security measures, provide a reference to the decision-making departments. Key words: Airport coal pipeline project; project safety; project risk; safe

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論