版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、破樁頭及樁間土清理施工專項方案~1~目錄第一章編制說明及依據(jù).....................................................................................................................31.1編制說明.................................................................
2、..................................................................31.2編制依據(jù)...................................................................................................................................3第二章工程概況.......
3、..........................................................................................................................32.1項目簡介..........................................................................................
4、.........................................32.2建筑和結(jié)構(gòu)設(shè)計概況..............................................................................................................42.3施工段劃分...............................................
5、...............................................................................42.4分部分項工程概況...................................................................................................................5第三章施工準(zhǔn)備......
6、...........................................................................................................................63.1原材料要求與準(zhǔn)備.....................................................................................
7、..............................63.2機(jī)械設(shè)備及儀器.......................................................................................................................63.3勞動力安排...................................................
8、............................................................................73.4作業(yè)條件...................................................................................................................................83.5技
9、術(shù)準(zhǔn)備...................................................................................................................................9第四章土方開挖..............................................................................
10、...................................................94.1施工順序...................................................................................................................................94.2施工工藝......................
11、.............................................................................................................94.3放線定位及高程等測量工作...............................................................................................
12、..104.4控制軸線投測的精度要求.....................................................................................................114.5高程控制............................................................................................
13、.....................................114.6施工方法.................................................................................................................................114.7基坑排水施工..................................
14、.......................................................................................12第五章破混凝土樁頭.......................................................................................................................125
15、.1施工準(zhǔn)備.................................................................................................................................125.2破樁頭.............................................................................
16、........................................................135.3破樁頭注意事項.....................................................................................................................14第六章砌磚胎模..........................
17、.....................................................................................................146.1材料準(zhǔn)備..............................................................................................................
18、...................14破樁頭及樁間土清理施工專項方案~3~第一章第一章編制說明及依據(jù)編制說明及依據(jù)1.11.1編制說明編制說明本工程能否正常施工,滿足我公司與建設(shè)單位所簽訂《施工合同》所規(guī)定的工期要求,能在560天日歷工期內(nèi)圓滿完成該工程的施工任務(wù),基礎(chǔ)樁間土開挖及樁頭破在整個項目目中起到關(guān)鍵性的作用,為下道工序提供最基本的操作面,能否在工程開始就轟轟烈烈的組織正常施工,體現(xiàn)世界500強企業(yè)的優(yōu)勢,那樁間挖土及樁頭破
19、除就是整個項目最最關(guān)鍵施工工序,起著承上啟下的作用。但在施工過程中質(zhì)量及安全是施工第一位的。1.21.2編制依據(jù)編制依據(jù)1.2.1本專項施工方案的編制依據(jù)有:序號標(biāo)準(zhǔn)名稱標(biāo)準(zhǔn)標(biāo)號1《砌體工程施工質(zhì)量驗收規(guī)范》GB5020320022《建筑地基礎(chǔ)工程施工質(zhì)量驗收規(guī)范》GB5020220023《建筑工程施工質(zhì)量驗收統(tǒng)一標(biāo)準(zhǔn)》GB5030020014《混凝土結(jié)構(gòu)工程施工質(zhì)量驗收規(guī)范》GB5020420115《云南省建筑工程施工質(zhì)量驗收統(tǒng)一規(guī)程
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 灌注樁破樁頭技術(shù)交底 -
- 灌注樁技術(shù)交底(破樁頭)
- 灌注樁破樁頭技術(shù)交底--
- cfg樁破樁頭砼再利用探討
- 樁間土開挖及截樁施工方案
- 樁間土開挖方案
- cfg樁頭補樁方案
- 樁基工程樁頭接樁方案
- 破樁頭技術(shù)交底(原創(chuàng))
- 破樁頭技術(shù)交底及圖片展示
- cfg樁補樁頭技術(shù)處理方案
- cfg樁補樁頭技術(shù)處理方案
- 鄭州粉土內(nèi)抗滑樁樁間土拱及合理樁間距研究.pdf
- 破樁頭施工協(xié)議書
- 預(yù)制樁截樁頭
- 破樁頭承包合同
- d磚胎模破樁頭技術(shù)交底
- 樁基破樁頭勞務(wù)合同終版
- d磚胎模破樁頭技術(shù)交底
- 靜壓樁沉樁擠土效應(yīng)和樁間土固結(jié)特征理論分析.pdf
評論
0/150
提交評論