斜拉橋主塔施工專項(xiàng)方案_第1頁
已閱讀1頁,還剩99頁未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、199目錄目錄第一章編制說明...................................................61.1編制依據(jù).....................................................61.2計(jì)算說明.....................................................6第二章工程概況.........................

2、..........................62.1工程規(guī)模及結(jié)構(gòu)特點(diǎn)...........................................62.2自然條件及施工環(huán)境...........................................72.3主要工程數(shù)量.................................................8第三章技術(shù)特點(diǎn)及技術(shù)等級(jí)..........

3、...............................83.1工程技術(shù)特點(diǎn).................................................83.2工程技術(shù)等級(jí).................................................9第四章施工方案及施工工藝.........................................94.1主塔施工工藝流程.....

4、........................................94.2施工平面布置................................................114.3索塔總體施工方法、工序......................................124.4主塔測(cè)量控制................................................184.5勁性骨架

5、安裝................................................234.6鋼筋綁扎....................................................244.7模板........................................................274.8灌注砼......................................

6、................29399第七章施工主要機(jī)械設(shè)備和材料....................................717.1機(jī)械設(shè)備....................................................717.2材料計(jì)劃....................................................727.3材料供應(yīng)保證及措施.............

7、.............................727.4材料及結(jié)構(gòu)質(zhì)量保證措施......................................73第八章施工組織安排..............................................748.1管理人員組織................................................748.2勞動(dòng)力配置...........

8、.......................................768.3三班倒搶工的措施............................................768.4勞動(dòng)力保證措施..............................................78第九章施工進(jìn)度計(jì)劃..............................................789.1施工工期

9、計(jì)劃................................................789.2施工工期保證措施............................................8093技術(shù)保證措施...............................................82第十章工程質(zhì)量保證措施..........................................8

10、210.1質(zhì)量管理組織機(jī)構(gòu)...........................................8210.2保證質(zhì)量的技術(shù)管理措施.....................................8210.3工程計(jì)量管理措施...........................................8310.4材料檢驗(yàn)制度.........................................

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論